Step 1: Please make sure that top level of the frame is matching field – surface.
Step 2: Prepare a concrete bed according to height of the frame.
Step 3: After fixing a frame in concrete bed, please follow it for 48hrs at least to set before using it.
Step 4: Frame is not designed to bare a load; hence it should be supported from all sides.
*Product warranty is subjected to process of installation and up to rated load capacity and according to company policy.
Sr. No. | Cat. No. | Outer Frame Size | Frame Clear Size | Weight | Qty/Carton | MRP/PCS |
---|---|---|---|---|---|---|
SQUARE | ||||||
1 | M-101 | 300×300 (12×12) | 250×250 (10×10) | 3.0 | 10 | 629 |
2 | M-102 | 380×380 (15×15) | 300×300 (12×12) | 4.5 | 7 | 914 |
3 | M-103 | 450×450 (18×18) | 280×280 (15×15) | 7.0 | 5 | 1214 |
4 | M-104 | 535×535 (21×21) | 450×450 (18×18) | 11.0 | 3 | 1514 |
5 | M-105 | 600×600 (24×24) | 510×510 (20×20) | 13.0 | 2 | 2043 |
RECTANGLE | ||||||
1 | R-101 | 450×600 (18×24) | 350×510 (14×20) | 10.3 | 3 | 1514 |
© Copyright 2016 by Ganga Bath Fittings Limited | All Right Reserved.
Design & Developed By: Spartan branding | Disclaimer